Why Data exchange for electricity meter reading, tariff and load control - Companion specification: Part 3 smart meter (Transformer Operated KWh And KVarh, Class 0.2 S, 0.5 S And 1.0 S) needs BIS certification
Data exchange for electricity meter reading, tariff and load control - Companion specification: Part 3 smart meter (Transformer Operated KWh And KVarh, Class 0.2 S, 0.5 S And 1.0 S) falls under the Electrical & Electronics category and is covered by IS 15959: Part 3 (2017). Manufacturers and importers must obtain the ISI mark licence from the Bureau of Indian Standards before the product can be manufactured, imported, stored or sold in India. Selling a notified product without a valid BIS licence can lead to seizure of stock, marketplace delisting and penalties under the BIS Act, 2016.
Testing & costs
Sample testing for IS 15959: Part 3 (2017) is currently available at 1 BIS-recognised laboratory across India. Reported test charges range from ₹1.5L (excluding GST), depending on the laboratory, the number of models/varieties and the tests included in the scope. Certko can help you pick a lab that balances cost, turnaround time and location.
Typical process
- Standard & scope check – confirm your exact product variant maps to IS 15959: Part 3 (2017).
- Documentation – factory details, quality control records, test equipment list and trademark proof.
- Sample testing – testing at a BIS-recognised lab against every clause of the standard.
- Factory inspection – BIS officers audit the manufacturing site (for ISI mark licences).
- Grant of licence – on successful evaluation, the licence/registration is issued, typically within 6-12 weeks.











